MACHINE OPERATION
Ÿ
Insert the two pipe handles into the bottom handle
and secure them using washer and knob (2 Nos) by
tightening lightly. Ensure that the handles are
assembled according to their marked position.
Machine Assembly & Operation
Ÿ
Fit the top handle over the pipe handles and secure
them with washer and screw (2 Nos). Ensure that the
label on the top handle is facing the front of the
machine.
l
Remove the retaining spring and place the handle in
upright position.
Ÿ
Pass the free end of the pull cable through the plastic
guide in RH handle.
Ÿ
Plug the cable to the top handle assembly.
Ÿ
Install the fresh water tank in between the two pipe
handles and secure it using knobs.
Ÿ
Fix the two brushes using the brush shafts.
Ÿ
Now tighten firmly both the knobs and screws
alternately. Insert the dummy caps provided to cover
the screws (2 nos) in the top handle.
9
Port A Scrub 12 Battery
Ÿ
Secure the allen key in the slot
provided in the handle tube for
further usage.