3.2
Connection
3.2.1
Connecting the platform
Connection of an analogue Puro® platform or a commercially available strain gauge load
cell to a Puro® indicator.
1
DGND
Ground
2
S-
Signal-
3
S+
1.
Switch off the indicator and disconnect from the electrical supply.
2.
Turn over the indicator.
3.
Remove the four rubber plugs on the back.
4. Loosen the screws underneath.
5.
Remove the cover.
6. Loosen the screw connection.
7.
Run the load cell cable through the screw connection.
8. Secure the wires of the load cell cable into the terminals; when doing so, pay
attention to the pin assignments and the color coding of the connection cable for the
platform/load cell.
Floor platform Puro®
3 Device installation
EN-8
Minebea Intec