© 2013 MIMAKI ENGINEERING CO.,LTD.
6.3.2
P.1
R.1.1
6.3.2 Y-axis Motor
Work procedures
1. Turn off the main power supply.
2. Loosen the screws to make the belt tension free.
3. Remove the
YM top plate
together with the bearing.
4. Remove the
YM stud
.
5. Disconnect the connector.
6. Remove the Y-axis motor together with the YM-BKT.
7. Remove the
YM-BKT
from the Y-axis motor.
8. Reverse the disassembly procedure for reassembly.
Turn the main power OFF when turning the power OFF. It is very dangerous if sleep mode func-
tions mistakenly during the operation.
Proceed with the work after well confirmed the following processes in advance.
3.2.2 Replacement of the Y-axis Motor
Screw
YM top plate
YM stud (x2)
Screw
YM-BKT
Connector
YM-BKT
Y-axis motor
MAINTENANCE MANUAL > Disassembly and Reassembly > Drive System > Y-axis Motor
Model
SWJ-320S
Issued 2012.07.19 Revised 2012.08.17 F/W ver
Remark
1.1
Summary of Contents for SWJ-320 S2
Page 209: ......
Page 210: ...D500764 12 28082013 MIMAKI ENGINEERING CO LTD 2013 WK FW 2 20 ...