Page 1: ... INTO BRUSH HOLDER BEFORE ROUTING THRU WIRE TRAPS TUCK LEADS 7 AND 8 DOWN INTO THE WIRE TRAP UNDER SWITCH TUCK LEADS 3 AND 4 DOWN INTO THE WIRE TRAPS BETWEEN SWITCH AND FIELD NOTE LEAVE NO SLACK ON FIELD SIDE OF WIRE TRAPS WIRE t4 BLACK SCHEMATIC NOTE All leads must be held to 5 l 8 All field leads to ba measured from and perpendicular to laminations All lead lengths are before stripping 1 TERMINA...