
Pellerin Milnor Corporation
2.
Facility Prerequisites
BNWUUI03.R01 0000254786 B.4 B.7 1/2/20 2:19 PM Released
Required Condition
Supporting Information
structural support
See document BNUUUI01 “Vital Information About the Forces
Imparted to Supporting Structures by Laundering Machines”
which can be found in the installation manual and also at
https://milnor.sharefile.com/d-s8408ba617d244d98
.
protected storage
If the machine must be stored temporarily, it must be protected
from dampness and excessive temperatures.
access to the final location
See the machine dimensional drawing, which can be found at the
end of the installation manual, for overall dimensions. Partial dis-
assembly is sometimes possible. Contact the Milnor
®
Service
department.
clearances for machine
movement and maintenance
See the dimensional drawing.
operational clearances
Adequate clearance around controls and for movement of laundry
equipment such as carts. See the dimensional drawing.
available utilities
See the dimensional drawing and the external fuse and wire
document.
available drain(s)
See the dimensional drawing. The drain valve(s) must have unre-
stricted access to a drain trough of sufficient capacity in the
foundation.
laundry room ventilation
The machine will contribute heat and vapors to the laundry room,
which must provide adequate ventilation.
3.
Rigger Precautions
BNWUUI03.R02 0000254785 B.6 B.7 1/2/20 2:19 PM Released
CAUTION:
Incorrect rigging —
can cause mishaps and costly machine damage.
�
Know and accommodate the machine shipping weight.
�
Use only lifting eyes for crane lifting.
�
Use long cables or a spreader bar for crane lifting.
�
Leave the machine skidded as long as possible.
�
Protect fragile or sensitive machine components.
�
Prepare the foundation and install anchor bolts correctly.
�
Set the machine at the correct height and level.
�
Apply machinery grout evenly so that support is distributed.
�
Tighten anchors alternately so that the hold-down force is distributed.
Handling a Washer-extractor from Delivery to Final Location
28
Summary of Contents for MWF100C7
Page 2: ......
Page 8: ......
Page 9: ...Installation 1 5 ...
Page 43: ...Service and Maintenance 2 39 ...
Page 55: ...2 Drive Assemblies 2 1 51 ...
Page 64: ...Pellerin Milnor Corporation Bearing Assembly 4840F MWF100 MWF125 2 of 6 60 ...
Page 71: ...2 Suspension Assemblies 2 2 67 ...
Page 74: ......
Page 75: ...2 Tilt Assemblies 2 3 71 ...
Page 80: ......
Page 81: ...2 Door Assemblies 2 4 77 ...
Page 89: ...2 Water Steam Drain 2 5 85 ...
Page 97: ...2 Chemical Supply Assemblies 2 6 93 ...
Page 102: ......
Page 103: ...2 Pneumatic Assemblies 2 7 99 ...
Page 107: ...2 Control and Sensing Assemblies 2 8 103 ...
Page 109: ...Reference 3 105 ...
Page 110: ......
Page 111: ...3 Dimensional Drawings 3 1 107 ...
Page 112: ......
Page 113: ...109 ...
Page 114: ......
Page 115: ...111 ...
Page 116: ...112 ...