
14 (See
BIIFBM13.)
(See BMP130002.)
2
Section A-A: Door Installation
Section C-C:
Section D-D:
Section B-B: Door Installation
Install the gasket into the door before
installing the glass. Observe the
location of the rubber seal joint line and
adjust if necessary.
13
11
12
13
13
12
17,18
20
C
C
D
D
Ensure that the gasket joint
is at top-dead-center.
Door Glass Installation
Door Assembly
Door Assembly:
4
(6 places)
Shellfront
10
Page (2 / 3)
PELLERIN MILNOR CORPORATION
PELLERIN MILNOR CORPORATION
BMP160021/2017183A
20” Flat Front Door
36 21V5Z,
36 26V5Z, 36 26V7Z, 42 26V6Z, 42 30V6Z
0
36021V7Z,
0
0
0
0
Lock, Hinge, and Door Glass Installation
63
Summary of Contents for 36021V5Z
Page 2: ......
Page 35: ...Service and Maintenance 1 31 ...
Page 44: ......
Page 45: ...Drive Assemblies 2 41 ...
Page 52: ......
Page 53: ...Bearing Assemblies 3 49 ...
Page 65: ...20 Inch Door Assemblies after 8 2016 4 61 ...
Page 75: ...Chemical and Supply Devices 5 71 ...
Page 83: ...Water Piping Assemblies 6 79 ...
Page 96: ......