9
Installation
Preparation of the System
A
•
Open the front cover.
Locate the tie wrap used to hold the Booster Pump in place during
shipping (A).
B
•
Press on the tab of the tie wrap (B).
Remove and pull the tie wrap out.
C
•
Locate the protective foam found at the UV lamp cable.
Remove it (C).
Connection of Tubing for a Direct-Q 3 R
(Go directly to
section “Connection of tubing for a Direct-Q 5 and 8 R”
)
A
•
Rotate the Direct-Q 3 R so you can see the back of the system
(see photo A).
1. Feedwater tubing
2. Reject tubing
3. Overflow tubing
4. Tank outlet