OM-350 Page 12
2-9.
Lower Front Panel
Ref. ST-144 405-B
1
Work Output Terminal
2
Electrode Output Terminal
3
High Frequency Intensity
Control (See Section 3-9)
4
Spark Gaps (See Section 4-2)
5
Circuit Breaker CB1 (See
Section 2-11)
6
Gas Valve Fittings
7
115 VAC Duplex Receptacle
8
Remote Contactor And Cur-
rent Control Receptacle
1
2
3
4
5
6
7
8
2-10. Installing Gas Supply
Chain cylinder to running gear, wall,
or other stationary support so it
cannot fall and break off valve.
1
Cap
2
Cylinder Valve
Remove cap, stand to side of valve,
and open valve slightly. Gas flow
blows dust and dirt from valve.
Close valve.
3
Cylinder
4
Regulator/Flowmeter
Install so face is vertical.
5
Gas Hose Connection
Fitting has 5/8-18 right-hand
threads. Obtain and install gas
hose.
6
Flow Adjust
Typical flow rate is 15 cfh (cubic feet
per hour).
Make sure flow adjust is closed
when opening cylinder to avoid
damage to the flowmeter.
7
Gas In Fitting
8
Gas Out Fitting
The gas In and gas Out fittings have
5/8-18 right-hand threads.
Connect hose as shown.
Close access door.
ssb3.3* 5/94 – Ref. ST-158 697- / Ref. C-085 461
Tools Needed:
5/8, 1-1/8 in
4
5
6
1
2
3
Argon Gas
7
IN
OUT
8
GAS
To Torch
Summary of Contents for Syncrowave 500
Page 4: ......
Page 31: ...OM 350 Page 27 SD 202 703 A...
Page 39: ...OM 350 Page 35 Notes...
Page 53: ......
Page 54: ......