OM-216 655 Page 10
SECTION 4
−
OPERATION
4-1. ST 44 Series Panel Controls
956.142.675-_B
1
Voltage Control
2
Purge Control
3
Jog
4
2T
−
4T Switch
5
Power ON-OFF
6
Digital Voltmeter/MPM
7
Remote Control
Receptacle
8
In-Out Cooling
Connections For Torch
9
Torch Connection
10 Panel/Remote Control
Switch
11 Wire Speed Control
12 Circuit Breaker
13 Gas In Connector
14 Control Cable Connection
15 Weld Cable Connection
16 In-Out Cooling
Connections From Cooling
System
16
10
2
3
4
5
6
7
9
11
1
15
12
13
14
8
4-2. Run-In Control and Burnback Control
2
1
Run-In Control
Use control to set wire feed speed
before arc initiation
After arc initiation, wire feed speed
is controlled by the wire feed speed
control on the front control panel.
2
Burnback Control
Control adjusts the time welding
wire is energized after wire feed
stops.
956.142.675_B
1
2