Milestone FCS100 Installation Instructions Manual Download Page 5

Installation Instructions

FCS100

5

Assembly and Installation

Assembling Shelf and Brackets

1. Attach lower shelf (B) to hanger bracket (A) using four

10-24 x 5/8" Phillips pan head screws (D). (See Figure 1)

Figure 1

Attaching to Wall Mount

NOTE:

The FCS100 may be attached to the wall mount with

the display already in place, or with the display

removed. Proceed to either

Installing to Wall Mount

with Display Attached

or

Installing to Wall Mount

with Display Removed

section.

Installing to Wall Mount with Display Attached

1. Pull out bottom of display.
2. From below and behind the display, raise and hang hook

bracket (C) onto lower wall mount rail. (See Figure 2)

Figure 2

3. Hang shelf with hanger bracket onto the hook bracket (C).

(See Figure 3)

NOTE:

The shelf with hanger bracket may be adjusted up or

down on the hook bracket (C) in 7/8" increments for a

total height adjustment of up to 6-1/8".

Figure 3

1

(A)

(D) x 4

(B)

(C)

[Display shown removed for clarity]

 Wall Mount

(C)

3

Ergo In Demand, Inc.      Contact Information:

4900 Industry Drive

Central Point, OR 97502

800.888.6024 (Toll Free)

541.779.3763 (Office)

541.779.0829 (Fax)

[email protected] (Email)

Summary of Contents for FCS100

Page 1: ...oduct Description Portuguese Product Description Italian Product Description Dutch Product Description French Product Description FCS100 Ergo In Demand Inc Contact Information 4900 Industry Drive Cent...

Page 2: ...nstaller s responsibility to make sure all components are properly assembled and installed using the instructions provided WARNING Failure to provide adequate structural strength for this component ca...

Page 3: ...89 16 CENTERLINE OF MOUNT 25 1 638 48 13 18 334 71 61 15 59 53 46 2 10 19 0 482 90 5 40 137 23 1 60 40 76 3 75 95 25 18 00 457 20 Ergo In Demand Inc Contact Information 4900 Industry Drive Central Poi...

Page 4: ...QUIRED FOR INSTALLATION PARTS 2 E 2 10 24 x 1 D 4 10 24 x 5 8 A 1 B 1 C 1 Ergo In Demand Inc Contact Information 4900 Industry Drive Central Point OR 97502 800 888 6024 Toll Free 541 779 3763 Office 5...

Page 5: ...ection Installing to Wall Mount with Display Attached 1 Pull out bottom of display 2 From below and behind the display raise and hang hook bracket C onto lower wall mount rail See Figure 2 Figure 2 3...

Page 6: ...already attached to wall mount following instructions included with the wall mount 3 Hang FCS100 on wall mount rail 4 Adjust location and secure to wall mount rail using two 10 24 x 1 Phillips pan he...

Page 7: ...ZB EINDHOVEN The Netherlands P 31 0 40 2668620 F 31 0 40 2668615 Asia Pacific A Room 24F Block D Lily YinDu International Building LuoGang BuJi Town Shenzhen CHINA P 86 755 8996 9226 F 86 755 8996 92...

Reviews: