![Miele KM 6312 Operating And Installation Instructions Download Page 63](http://html.mh-extra.com/html/miele/km-6312/km-6312_operating-and-installation-instructions_234363063.webp)
Solid wood / tiled / glass
worktops
Preparing the worktop cut-out
a
Worktop
b
Cooktop
c
Gap
d
Wooden frame
(13 mm, to be provided on-site)
As the ceramic glass and the
worktop cut-out have a certain
dimensional tolerance, gap
c
(min.
1 mm) can vary.
^
Make the worktop cut-out as shown
in "Building-in dimensions".
Remember to maintain a
minimum
safety distance
(see "Safety
clearances").
^
Fix the wooden frame
d
7 mm below
the top edge of the worktop (see
diagram).
Connecting the mains connection
cable to the appliance
The mains connection cable must
be connected by a suitably qualified
and competent electrician in
accordance with current local and
national safety regulations.
^
Connect the mains connection to the
appliance according to the
connection diagram (see "Electrical
connection").
Installing the cooktop
^
Feed the mains connection cable
down through the cut-out.
^
Centre the cooktop
b
in the cut-out.
^
Connect the cooktop to the mains.
^
Check that the cooktop works.
^
Seal the remaining gap
c
with a
silicone sealant that is heat-resistant
to at least 160 °C.
Observe the silicone sealant
manufacturer's instructions.
For
granite and marble tiled
worktops
, only use silicone sealant
that has been specially formulated
for granite and marble.
Flush-fitted cooktops
63