^
Screw the mounting plate through the
ceiling and into the structural framing
using 8 x 60 lag bolts and washers.
Once tight, make sure that the
mounting plate can safely support
the weight of the hood.
^
Using at least two people, lift the
hood and guide the spring clips
through their respective slots in the
flange at the top of the chimney.
Make sure they click into place and that
the hood is hanging securely from the
spring clips before allowing them to
carry the weight.
Installation
30
Summary of Contents for DA 270
Page 8: ...Guide to the hood 8 ...
Page 20: ...20 ...
Page 21: ...Installation Instructions ...
Page 34: ...34 ...
Page 35: ...35 ...