Notes for installer
26
Maximum permis-
sible total duct
length
Adequate room ventilation must be ensured during operation.
Minimum inside duct diam-
eter (sheet metal ducting)
Maximum permissible total duct
length
Exhaust air
PRI 214
PRI 217
2 ¾" (70 mm)
16' 4 ⅞" (5 m)
3 ⅛" (80 mm)
65' 7 ⅜" (20 m)
3 ½" (90 mm)
104' 11 ⅞" (32 m)
4" (100 mm)
131' 2 ¾" (40 m)
Once the machine has been successfully installed and con-
nected, replace all the external parts that were removed.
Optional accessories
Mounting the
base (optional)
Mounting the optionally available base can raise the machine by
4" (100 mm).
Dismantle the mounting flaps on the left and right sides.
Unscrew the screw-on feet by the maximum amount
( > 2 ⅜" (60 mm)).
Hold the side columns with a suitable aid and remove the screw-on
feet.
Mount the screw-on feet into the base and push the base under the
column.
Screw the base to the base plate of the machine.