background image

4

1' 2"

4' 2¾"

4' 2¾"

FIRE PIT DIMENSIONS

TABLE OF CONTENTS

Materials List

Tool Check List

Foundation Guidelines

Level 1 - Level 4

Level 5 - Complete

Use & Care Instructions

2

3

3

5

6

7

TECHNIQUES 

Fasten each layer of block together with 

¼” - ⅜” bead of construction adhesive on 

all adjacent block faces unless otherwise

noted. Refer to the construction adhesive’s 

application instructions for proper use.

Follow suggestions on page 3 to build a proper foundation before starting your new project. If not 

already set, place the first level of block 1”- 2” below grade, level and fill in any gaps. Use Level 1 

as a reference to place the blocks for all remaining levels. 

Refer to the illustrations on the following pages to guide you through each step. Prior to adhering 

each level to the previously laid block, place the entire level of blocks and check to make sure the 

fire pit insert fits properly. Remove small sections at a time to place the adhesive. 

Once all levels are complete, position the insert into the finished pit. Wait a minimum of two days 

before starting a fire. 

INSTALLATION INSTRUCTIONS

* Do not over apply adhesive. It may reduce effectiveness.  

  Use mineral spirits to remove any unwanted adhesive.

Reviews: