When starting the Active Test, observe the Data List
to verify that SMRB and SMRG are ON. If the SMRs
do not turn ON, IG OFF and then IG ON and start the
Active Test again.
After starting the Active Test, you
have 30 seconds to press NEXT
on the GRX-5100 control panel.
If you miss the 30-second
window, charging will abort. You
will need to cycle the ignition to
begin the procedure again.
As charging is taking place,
monitor the battery voltage.
If battery is insufficiently
charged (not above minimum
voltage) after first 10-minute
cycle, repeat the charge cycle.
Battery Charge Active Test
The Battery Charge Active Test turns on SMRB and
SMRG so the battery can be charged through the frame
wire. To locate this Active Test, navigate to Powertrain
> Hybrid Control > Active Test > Battery Charge.
Toyota NiMH Battery Rescue Charging with the GRX-5100
Quick Training Guide QT015A
Click the tabs at the top to view each section
21 of 21
©Toyota Motor Sales, U.S.A., Inc., December 16, 2015