background image

(1) Fix two CO tube card on the red CO  soft tube: (see Figure 6).

2

(2) Relate the ends of red CO  soft tube respectively to CO intake port of mixed ball valve and 

2

2

round outlet ofCO  regulator valve. Lock it t firmly with the fixed card of two CO  channel on red 

2

2

CO  soft tube: (see Figure 7)

2

(3) TightentheCO  regulator table valve with hex nut port with the gas outlet of CO  tank by the 

2

2

wrench.(see Figure 8)

(4) Place the CO  tank and CO regulator valve component into the beer chassis and fix theCO  

2

2

tank by CO  tank bracket and fixed bolt (see Figure 9)

2

3. Install CO  gas cylinder and CO  regulator valve:

2

2

4.

Install beer barrels

5.

Install wine handle and fix wine faucet

图6

Put the bottled beer into the box and make the barrel's hole connected to the beer kegs 
connection port of the mixed ball valve closely. (See Figure 10) (when placing the kegs: 
hold the handle of the barrels to remove them to the front of beer machine, and then 
highlight the lower part of the front of beer keg to put them in the box. Finally, lift the 
bucket handle of the keg to push them into the box entirely.)

Notes

Figure 

6

Figure 

7

Figure 

5

Figure 

8

When taking beer, open the main switch of CO  gas cylinder, and rotate the regulator knob on CO  regulator table's valve so that it reaches a 

2

2

certain  pressure  value  (observing  regulator  table).Furthermore,  open  the  safety  switch  of  CO   regulator  table  valve  and  pull  back  the 

2

mixed  valve  control  handle,  then  lifting  up.  Loosen  your  grip  to  fix  it:  Close  the  door,  and  pull  the  beer  tower  components  forward  to  get 
beer.

?

When replacing the beer, please turn off the safety switch of CO  regulator valve and remove the mixed ball valve to remove the beer barrel.

2

?

When replacing CO  gas cylinder, remember to turn off the main switch of the CO  gas cylinder and safety switch of the CO  regulator valve. 

2

2

2

Afterwards, use a wrench to loosen the hexagonal nut port connecting theCO  regulator valve with CO  tank closely. Then remove the fixed 

2

2

bolt of CO  tank to remove CO  tank finally by a wrench.

2

2

?

In the process of installation, ensure that all parts are connected tightly and no air leaks.

?

When the hose connects the connection port, you can dip it by warm water or lubricated oil once confronted with any troubles.

?

If the high-pressure compressed gas in theCO tank is not handled properly, it could be dangerous:

1. Please the testing date of D.O.T in the cylinder neck before installation. If it is more than 5 years, don't use the product any more, and 
bring it back to the gas supplier.
2.CO  gas cylinder should be kept away from heat sources. The unused cylinders should be placed upright in ventilated cool place (preferably 

2

70 degrees Fahrenheit).

?

Figure 

10

2.Install the 

beer tower assembly

 and the mixed ball valve:

(1) Plug the beer tower assembly into the beer top cover to fix:
A.3.0 inch: does not require tower buckle. Put beer tower directly at the surface 
hole of the beer machine roof. Fix the beer tower assembly with screws directly on 
the roof of the beer machine. (See Figure 3)
B.2.5 inch: need tower buckle. Put the beer tower at the surface hole of the beer 
machine with 60 degrees inclined, and rotate 60 degrees clockwise along the card 
slot. Make the wine faucet is against the front side of beer machine. Fix the beer 
tower with washers in the box. (See Figure 4)

(2)Take out the accessories of the mixed ball valve. Fix the beer outlet of the mixed 
ball valve with the transparent hose of the beer tower components. (See Figure 5)

Figure 

4

2.5 inch

3. 0inch

Figure 

3

6.Install the 

upper cover guardrail and water box

:

Screw the wine handle clockwise with the wine faucet tightly. Then connect the wine 
faucet with beer tower components, and tighten it by a wrench. (See Figure 9)

CO  regulator 

2

valver

CO  gas 

2

cylinder

Bracket and retainer 
of CO  tank 

2

Safety switch

Regulating 
table

The red CO  soft tube

2

CO  gas cylinder

2

upper cover 
guardrail 

Beer barrels

Beer tower

water box

Place the upper cover guardrail , water box on the top of top cover. (See Figure 10)

Figure 

9

Summary of Contents for WHS-209BESS1

Page 1: ...WHS 209BESS1...

Page 2: ...ons may result in product damages or endanger the personal safety of users The symbols indicate matters that must be followed and those behaviors must be strictly executed in line with the operation r...

Page 3: ...cessible to water do not affect the electrical insulation performance of beer machine Since folding cardboard and plastic film may cause choking danger don t give the packing or other parts to childre...

Page 4: ...e temperature is adjustable The fault display will be restored after15 seconds later Rapid refrigeration function will be used only for the first barrel of beer in the box desiring to use as soon as p...

Page 5: ...letely Check and find the correct distance to hold glass from faucet when drawing Proper foam should be a tight creamy head and the collar on the average glass should be 3 4 to 1 high Beer drawn witho...

Page 6: ...rrels is 38 to 40 WILD BEER Beer when drawn is all foam or too much foam and not enough liquid beer Causes Corrections 1 Improper drawing beer into glass 1 Open faucet quickly and completely Check and...

Page 7: ...not so evident Wherever possible CO Gas should be used as 2 pressure source In high pressure systems where CO gas cannot be 2 sued a banner air gas Blender should be installed This introduces a small...

Page 8: ...CO gas cylinder 2 Outlet of CO gas cylinder 2 Main switch of CO gas cylinder 2 CO regulator valve 2 Regulating table Hex nuts port Regulating knob Safety switch Round air outlet Universal wheels witho...

Page 9: ...heCO regulator valve with CO tank closely Then remove the fixed 2 2 bolt of CO tank to remove CO tank finally by a wrench 2 2 In the process of installation ensure that all parts are connected tightly...

Reviews: