![Midea MWH-35i Operation Manual Download Page 6](http://html1.mh-extra.com/html/midea/mwh-35i/mwh-35i_operation-manual_1791871006.webp)
INSTALLATION INSTRUCTION
1. Check the capacity of power circuit
2. Power cord installation
3. Water heater installation
4. Plumbing connection
5. Power supply connection
6. Water Supply
2. POWER CORD INSTALLATION:
Step 1
Remove the screws at the bottom of the unit.
Lift up the Main Switch Knob and Power Knob
to make it free. Remove the front plate gently.
Step 3
Gash the middle of the
of the power cord jacket
with a sharp knife in order to put into power lines.
Step 5
Tighten the wire-pressing plate with screws to
primary position, ensure that the power cord not be
pulled out more than 60N.
Step 2
Remove the power cord wire pressing plate and
keep the screws.
Step 4
Screw the power cord into the jacket for installation
of wire pressing plate.
Step 6
Connect the power cord to wiring terminals; the
method is as shown in picture.
Note:
the installation position of neutral line (blue), live
line (brown/red) and earth line (green/yellow) should be
corresponding to the other end on wiring terminals.
Summary of Contents for MWH-35i
Page 12: ...MWH 35MPC MWH 35M MWH 35i WIRING DIAGRAM...
Page 24: ...MWH 35MPC MWH 35M MWH 35i DIAGRAM PEMASANGAN KAWAT...
Page 25: ...MWH 35MPC MWH 35M MWH 35i...
Page 26: ......
Page 27: ...3 2 2 1 6 7 7 7 8...
Page 28: ...MWH 35MPC MWH 35MPC MWH 35M MWH 35i MWH 35M MWH 35i...
Page 30: ...2...
Page 31: ...3 4...
Page 32: ...5 6...
Page 33: ...MWH 35MPC MWH 35MPC 1 2...
Page 34: ......
Page 35: ...MWH 35MPC MWH 35M Relay Relay Relay Relay MWH 35M Relay Relay...
Page 36: ......