![Midea MSC-21CRN1 Service Manual Download Page 20](http://html1.mh-extra.com/html/midea/msc-21crn1/msc-21crn1_service-manual_1790851020.webp)
Service manual
16
8.7
Balance refrigerant of the 2-way, 3-way valves
Procedure:
1. Confirm that both the 2-way and 3-way valves are set to the open position.
2. Connect the charge set to the 3-way valve’s service port.
Leave the valve on the charge set closed.
Connect the charge hose with the push pin to the service port.
3. Open the valves (Low side) on the charge set and discharge the refrigerant until the gauge
indicates 0.05 to 0.1 Mpa.
If there is no air in the refrigeration cycle [the pressure when the air conditioner is not running is higher
than 0.1Mpa, discharge the refrigerant until the gauge indicates 0.05 to 0.1 Mpa. If this is the case, it will
not be necessary to apply a evacuation.
Discharge the refrigeration gradually; if it is discharged too suddenly, the refrigeration oil sill be
discharged.
Summary of Contents for MSC-21CRN1
Page 1: ...Cover MSC 21CRN1 MSC 21HRN1 MSC 24CRN1 MSC 24HRN1 MSC 28CRN1 MSC 28HRN1 ...
Page 4: ......
Page 10: ...Service manual 6 4 Refrigerant cycle diagram Cooling only Heat pump mode ...
Page 12: ...Service manual 8 6 Schematic diagram and Wiring diagram 7 1 Schematic diagram ...
Page 13: ...Service manual 9 ...
Page 14: ...Service manual 10 7 2 Wiring diagram 7 2 1 MSC 21CRN1 MSC 24CRN1 MSC 28CRN1 ...
Page 15: ...Service manual 11 7 2 2 MSC 21HRN1 MSC 24HRN1 MSC 28HRN1 ...
Page 30: ...Service manual 26 ...