Installation
Choosing The Right Location
Your installation location should meet the following
requirements:
-Make sure that you install your unit on an even surface to
minimize noise and vibration.
-The unit must be installed near a grounded plug, and the
Collection Tray Drain (found on the back of the unit) must
be accessible.
-The unit should be located at least 30cm (12”) from the
nearest wall to ensure proper air conditioning.
-DO NOT cover the Intakes, Outlets or Remote Signal
Receptor of the unit, as this could cause damage to the
unit.
NOTE:
All the illustrations in the manual are for explanation
purpose only. Your machine may be slightly different.
The actual shape shall prevail.
The unit can be controlled by the unit control panel
alone or with the remote controller. This manual does
not include Remote Controller Operations, see the
<<Remote Controller Instruction>> packed with the
unit for details.
7
Note About Fluorinated Gasses
-Fluorinated greenhouse gases are contained in
hermetically sealed equipment. For specific information
on the type, the amount and the CO2 equivalent in tonnes
of the fluorinated greenhouse gas(on some models),
please refer to the relevant label on the unit itself.
-Installation, service, maintenance and repair of this unit
must be performed by a certified technician.
-Product uninstallation and recycling must be performed
by a certified technician.
EN
Summary of Contents for MPPB-14CRN7
Page 31: ...Preparation NOTE The unit you purchased may be look like one of the following s 3 EN...
Page 88: ...3 Pr paration NOTE L appareil que vous avez achet e peut ressembler l une des suivantes FR...
Page 157: ...3 Voorbereiding OPMERKING Het door jou aangekocht apparaat kan er als volgt uitzien NL...
Page 203: ......
Page 204: ......
Page 205: ......
Page 206: ......
Page 207: ......
Page 208: ......
Page 209: ......
Page 210: ......
Page 211: ......
Page 212: ......
Page 213: ......
Page 214: ......
Page 215: ......
Page 216: ......
Page 217: ......
Page 218: ......