5
INSTALLATION
WALL DRILLING AND BRACKET FIXING
As the first step, proceed with the following drawings:
●
A vertical line up to the ceiling or up to the upper limit, at the center of the area in which the
hood is to be fitted.
●
A horizontal line
A
at
980 – 1080
mm above the cooker top.
●
A horizontal line
B
at
X
mm above the horizontal line
A
.
●
A horizontal line
C
at 261 mm below the horizontal line
A (solution 2)
.
Mark points:
●
Mark a point
(1)
on the horizontal line
A, 80
mm to the right of the vertical reference line.
●
Repeat this operation on the other side and on the vertical reference line, checking that the
three marks are on one horizontal line.
●
Mark a point
(2)
on the horizontal line
B, 40
mm to the right of the vertical reference line.
●
Repeat this operation on the other side, checking that the two marks are on one horizontal line.
●
Mark a point
(3)
on the horizontal line
C, 180
mm to the right of the vertical reference line
(solution 2)
.
●
Repeat this operation on the other side , checking that the two marks are on one horizontal line.
Fix the brackets:
●
Drill at the marked points
(1), (2), (3) (solution 2)
, using a ɸ10 mm drill bit. Insert the wall plugs
11 into the holes
(1), (2), (3) (solution 2)
.
● Fix the hood fixing bracket
20
with 3 screws
10
(5 x 50) at the horizontal line A. Fix the chimney
fixing bracket
21
with 2 screws
10
(5 x 50) at the horizontal line B.
Option Chimney
X
1
400+0
/
2
400+300
390-620