MCAC-VTSM-2016-02 R410A All DC Inverter Mini VRF
Installation 53
4.7 Additional refrigerant charge
Calculate the added refrigerant according to the diameter and the length of the liquid side pipe of the outdoor
unit/indoor unit connection.
Liquid Side Piping Diameter
Refrigerant to be Added Perimeter Piping
Φ6.4
0.022kg
Φ9.53
0.054kg
Φ12.7
0.110kg
Φ15.9
0.170kg
Φ19.1
0.260kg
Φ22.2
0.360kg
Note: Additional refrigerant volume of branch pipe is 0.1kg per item (Consider the liquid side of divergent pipe only)
4.8 Leak detection
Use soap water or leak detector to check every joint whether leaks or not.
Note: A is low pressure side stop valve.
B is high pressure side stop valve.
C and D are connecting pipes interface of indoor and outdoor units.
4.9 Heat insulation
Do the heat insulation to the pipes of air side and liquid side separately. The temperature of the pipes of air side
and liquid side when cooling, for avoiding condensation please do the heat insulation fully.
The air side pipe should use closed cell foamed insulation material, which the fire-retardant is B1 grade and
the heat resistance over 120°C.
When the external diameter of copper pipe≤Φ12.7mm, the thickness of the insulating layer at least more than
15mm; When the external diameter of copper pipe≥Φ15.9mm, the thickness of the insulating layer at least
more than 20mm.
Please use attached heat-insulating materials to do the heat insulation without clearance for the connecting
parts of the indoor unit pipes.
5. Electric Wiring Installations
5. 1 Highlights of electrical installation
1) Please separately design the special power of indoor units and outdoor units.
2) The power adopts special circuit, and installs creepage protector and manual switch.
3) The indoor units’ power, creepage protector and manual switch connecting to the same outdoor unit must be
general. All indoor units must be the same circuit, and must simultaneously on or off; otherwise, system life will
seriously effect, and appear the situation not to solve.
4) The
communication line between indoor units and outdoor units please use 3 core shielded wiring, while don’t
use the multi core wiring without shielded affect, for the interference is reduced each other
5) Purchased wiring, parts and materials should be in compliance with the local and national regulations.
6) All field wiring construction should be finished by qualified electrician.
7) Air conditioning equipment should be grounded according to the relevant local and national electrical
regulations.
8) Current leakage protection switch should be installed (select current leakage breaker in light of the 1.5-2 times
of total loading rated current.)
Check point of outdoor unit
Check point of indoor unit
D
A
B
C