1) In case of installing one unit per row.
6.4.2 In case of multiple-row installation (for roof top use, etc.)
10
6.3 Drain hole position
6.4 Installation space requirements
6.4.1 In case of stacked installation
4/6 kW
It's necessary to install an electrical heating belt if water can't drain out in cold weather even the big drain hole has
opened.
It is suggested to site the unit with the base electric heater.
CAUTION
Drain hole
This drain hole is covered by rubber
plug. If the small drain hole can not
meet the drainage requirements, the
big drain hole can be used at the same
time.
≥500mm
A
≥
200mm
A(mm)
≥2000
Unit
4~10kW
1) In case obstacles exist in front of the outlet side.
2) In case obstacles exist in front of the air inlet.
≥500mm
≥
20mm
≥
300mm
Drain hole
8/10kW
It's necessary to install the water outlet connection pipe assembly if the unit is mounted on the top of each other,
preventing condensate flow to the heat exchanger.
NOTE
Fig: 6-5
Fig: 6-6
Summary of Contents for M-thermal Split MHA-V10W/D2N8
Page 2: ......
Page 39: ...35 NOTE...
Page 40: ...16125300001999 V2 0...
Page 41: ...A4 105g 100g...
Page 42: ......
Page 43: ......
Page 44: ......
Page 45: ......
Page 46: ......
Page 47: ......
Page 48: ......