
34
1. Confirmation Before the Trial Operation
1.1 All the installation is complete.
1.2 Water heater is installed correctly.
1.3 The pipelines and wiring are correct.
1.4 The accessories are installed correctly.
1.5 The drainage is smooth.
1.6 The thermal insulation is sound.
1.7 The earthing wire is connected correctly.
1.8 The power voltage is consistent with the rated voltage of the heater.
1.9 No obstacle at the air inlet and outlet of the unit.
1.10 The leakage protector can work effectively.
2. Operating Instruction
2.1
The appearance of controller
2.2
Name and function description of LCD screen of wire controller
Summary of Contents for LRSJ-120/NYN1
Page 9: ...9 2 Capacity COP curve...
Page 10: ...10 MODEL 6 kw...
Page 11: ...11...
Page 12: ...12 MODEL 8 kw...
Page 13: ...13...
Page 14: ...MODEL 12 kw 14...
Page 15: ...15...
Page 16: ...16...
Page 18: ...18 4 Service Space...
Page 19: ...19 5 Wiring Diagrams 6Kw and 8Kw wiring diagrams...
Page 20: ...20 12Kw and 14Kw wiring diagrams...
Page 22: ...22 7 Exploded View MODEL LRSJ 120 NYN1 LRSJ 140 NYN1...
Page 24: ...24 8 PCB explain A...