
MCAC-HTSM-201409 Midea R410A Domestic Pools & Spas HPWH 50Hz Technical Manual
28
A discharge pipe connected to the pressure-relief is to be installed in a continuously downward
direction and in a frost-free environment.
The maximum target temperature is limited to 35°C in order to protect the swimming pool liner.
2. Unit Installation
Enough space of installation and maintenance is available. The air inlet and outlet free from
obstacles and strong wind. The bearing surface is level and can bear weight of the unit, and is
suitable for installing the unit without increasing noise or vibration. The operation noise and the
expelling of air do not affect neighbors.
Installing the unit in any of the following places may lead to faults of the unit. (If that is inevitable,
please consult the factory)
The site contains mineral oils such as cutting lubricant.
Hot spring area where corrosive gases exist, e.g., sulfide gas.
Factories where the power supply voltage fluctuates seriously.
Inside a car or cabin.
Place like kitchen where oil permeates.
Place where strong electromagnetic waves or flammable gases or materials exist.
Other special environments.
The unit must be shipped and stored in the upright position on a pallet and in the original
packaging. In the contrary case, place the unit in the vertical position on the pallet and
check its global state.
Under no circumstances may the unit be operated immediately if it was placed horizontally.
Wait at least 12 hours before operating the pump.