TEST RUNNING

Perform the electric safe check after completing installation:
1. Grounding work 
    After finishing grounding work, measure the grounding resistance by visual detection and 
    grounding resistance tester. Make sure the grounding resistance is less than 4

2. Electrical leakage check (performing during test running)
    During test operation after finishing installation, the serviceman can use the electroprobe 
    and multimeter to perform the electrical leakage check. Turn off the unit immediately if 
    leakage happens. Check and find out the solution ways till the unit operate properly.

A: Lo packed valve  B: Hi packed valve 
C and D are ends of indoor unit connection.

CAUTION

Indoor unit
check point

D

B

C

A

Outdoor unit
check point

Cover

Fig.22

 

  Electrical safety check

 

  Gas leak check

1. Soap water method:
     

Apply a soap water or a liquid neutral detergent 

     on the indoor unit connections and outdoor unit 
     connections by a soft brush to check for leakage 
     of the connecting points of the piping. If bubbles 
     come out, it indicates that the pipes have leakage.

2. Leak detector
    Use the leak detector to check for leakage.

TEST RUNNING

3.Safety and leakage check

Perform  test operation after completing gas leak check at the flare nut connections and 
electrical safety check.
    Check that all tubing and wiring have been properly connected.
    Check that the gas and liquid side service valves are fully open.
1. Connect the power, press the ON/OFF button on the remote controller to turn the unit on.
2. Use the MODE button to select COOL, HEAT, AUTO and FAN to check if all the functions
     works well. 

O

3. When the ambient temperature is too low(lower than 17 C), the unit cannot be controlled by 
     the remote controller to run at cooling mode, manual operation can be taken. Manual 
     operation is used only when the remote controller is disable or maintenance necessary.
     Hold the panel sides and lift the panel up to an angle until it remains fixed  with a clicking 
     sound.
     Press the Manual control button to select the AUTO or COOL, the unit will operate under 
     Forced AUTO or COOL mode(see User Manual for details).
4.  The test operation should last about 30 minutes.

When relocate the unit to another place, 
perform evacuation using vacuum pump.
Make sure the refrigerant added into the air 
conditioner is liquid form in any case.
(Not applicable to the units adopt freon R22 )

Open the valve stem until it hits against the 
stopper. Do not try to open it further.
Securely tighten the valve stem cap with a
spanner or the like.
Valve stem cap tightening torque (See 
Tightening torque table in previous page ).

Outdoor
unit

Indoor
unit

Refrigerant 

Flare nut

Stopper

Cap

Valve body

Packed valve

Half union

Gas side

Liquid side

A

C

D

B

Valve stem

Fig.19

Fig.20

2.When Using the Vacuum Pump

(For method  of using a  manifold valve, refer 
to its operation manual.)
1. Completely tighten the flare nuts, A, B, C, D, 
    connect the manifold valve charge hose to a 
    charge port of the low-pressure valve on the 
    gas pipe side.
2. Connect the charge hose connection to the 
    vacuum pump.
3. Fully open the handle Lo of the manifold valve.
4. Operate the vacuum pump to evacuate. After 
    starting evacuation, slightly loose theflare nut 
    of the Lo valve on the gas pipe side and 
    check that the air is entering(Operation noise 
    of  the vacuum pump changes and a 
    compound meter indicates 0 instead of minus)
5. After the evacuation is complete, fully close 
    the handle Lo of the manifold valve and stop 
    the operation of the vacuum pump. Make 
    evacuation for 15 minutes or more and check 
    that the compound meter indicates 

5

    -76cmHg  (-1x10 Pa).
6. Turn the stem of the packed valve B about 

o

    45  counterclockwise for 6~7 seconds after 
    the gas coming out, then tighten the flare nut 
    again. Make sure the pressure display in the 
    pressure indicator is a little higher than the 
    atmosphere pressure.
7. Remove the charge hose from the Low 
    pressure charge hose.
8. Fully open the packed valve stems B and A.
9. Securely tighten the cap of the packed valve.

Fig.21

   

Caution in handling the packed valve

Manifold valve

Compound meter

-76cmHg

Handle Lo

Handle Hi

Charge hose

Charge hose

Vacuum pump

Pressure gauge

Low pressure valve

OUTDOOR UNIT INSTALLATION 

Manual control 

button

AUTO/COOL

Summary of Contents for CS337I-BPMB

Page 1: ...y and keep it for future reference ROOM AIR CONDITIONER The design and specifications are subject to change without prior notice for product improvement Consult with the sales agency or manufacturer f...

Page 2: ...n independent circuit and single outlet must be used If electrical circuit capacity is not enough or defect found in electrical work it will cause electrical shock or fire 6 Use the specified cable an...

Page 3: ...lation drawings Do not place any obstacles which may cause a short circuit of the discharged air Select a location which avoids causing a nuisance to neighbours from noise and air emissions from devic...

Page 4: ...ensed water from rear of the indoor unit is gathered in ponding box and is piped out of room Do not put anything else in the box Fig 4 1 For the left hand and right hand piping remove the pipe cover f...

Page 5: ...rrent ofthe unit should be installed in power circuit Ensurethe air conditioner is groundedwell 4 The appliance shall beinstalled in accordance with nationalwiring regulations Do not operate your air...

Page 6: ...rection where the discharged air is not blocked In the case that the installation place is exposed to strong wind such as a seaside make sure the fan operating properly by putting the unit lengthwise...

Page 7: ...en it with a spanner and torque wrench as shown in Fig 16 17 2 Tightening Connection Excessive torque can break nut depending on installation conditions Indoor unit tubing Flare nut Pipings Fig 16 Out...

Page 8: ...the AUTO or COOL the unit will operate under Forced AUTOor COOL mode see User Manual for details 4 The testoperation should last about 30 minutes When relocate the unit to another place perform evacua...

Reviews: