INSTALLATION AND OPERATION MANUAL,
ELECTRIC CABINET BASE CONVECTION STEAMER, MODELS ECX-2, ECX-10
PART NUMBER 10058R2
5
2008-11-12
2.0 INSTALLATION INSTRUCTIONS
Ideally an exhaust system should be located directly above the appliance to exhaust steam and
heat generated by the appliance.
1. Set the unit in place and level using a spirit level.
2. Ascertain that a floor drain (open gap) is convenient to the appliance drain.
3. Mark hole locations on floor through anchoring holes provided in flanged adjustable feet.
4. Remove appliance and drill holes in locations marked on floor and insert proper anchoring
devices.
5. Set unit back in position and re-level left to right and front to back.
6. Bolt and anchor appliance securely to the floor.
7. Seal bolts and flanged feet with Silastic or equivalent compound.
8. Make service connections as indicated.
WARNING: Electrical and grounding connections must comply with
applicable portions of the National Electrical Code and/or other local
electrical codes.
WARNING: Disconnect electrical power supply and place a tag on
the disconnect switch to indicate that you are working on the circuit.
Use copper wire suitable for at least 200 degrees Fahrenheit (90 degrees Celsius). The
steamer must be grounded. The wiring diagram is located on the inside right hand panel as
you face the steamer.