PD-IM-7401 Evaluation Board - User Guide
Copyright © 2009
Microsemi
Page
13
Rev. 1.0, 8-Apr-10
Analog Mixed Signal Group
2381 Morse Avenue, Irvine, CA 92614, USA; Phone (USA): (800) 713-4113, (ROW): (949) 221-7100 Fax: (949) 756-0308
5 Installation
This chapter describes the steps required to install and operate the Evaluation Board with any PoE application.
5.1
Preliminary Considerations and Safety Precautions
Verify that the board's power supply is turned on before the peripheral devices are turned on.
Prior to powering the board, connect all required peripherals.
Never hot swap units!
Verify that the board is properly configured prior to turning on the power supply.
5.2 Initial
Configuration
Note
: It is important to verify that the Evaluation Board is setup as shown in Figure 9 prior to starting any operation.
1. Connect the configuration board to the main board (J3).
2. Configure the board operation by selecting the required configuration on the configuration board switches
(SW#2).
3. Connect the SYC/UN-SYNC jumper (U3).
4. Connect a power cable from the power supply to the Evaluation Board (J2).
Ethernet
cable
Powered
Device
Power Supply
Power
Cable
Main DC
Input
J3
J2
Switch
Figure 9: Test Setup