INSTALLATION
2.1
Identify Suitable Location
We recommend a location where there is a straight length of pipe with no bends, constrictions or
obstructions within at least 10 times the pipe diameter upstream, and 5 times the pipe diameter
downstream.
Figure 4
Identifying a suitable location
IMPORTANT: DO NOT EXPECT TO OBTAIN ACCURATE RESULTS IF THE UNIT IS
POSITIONED CLOSE TO ANY OBSTRUCTION THAT DISTORTS THE UNIFORMITY OF THE
FLUID FLOW PROFILE (SEE PAGE 46). MICRONICS LTD ACCEPTS NO RESPONSIBILITY OR
LIABILITY IF PRODUCT HAS NOT BEEN INSTALLED IN ACCORDANCE WITH THESE
INSTRUCTIONS.
2.1.1
Additional Considerations for Locating U1000MkII-HM
For optimum reliability on boiler applications, the flow measurement needs to be made on the cold
side of the system. For optimum reliability in chiller applications, the flow measurement needs to be
made on the warmer side of the system.
Figure 5
Typical setup of U1000MkII-HM for boiler applications
UPSTREAM
10 x pipe
diameter
DOWNSTREAM
5 x pipe
diameter
U1000MkII
fluid flow