ASAP 2460 Operator’s Manual
Routine Maintenance
246-42800-01 - Aug 2013
7-23
d.) Observe the high pressure gauge. If the pressure decreases, tighten the nut connecting the
regulator to the gas bottle. If the pressure is stable, proceed to step e.
e.) Turn the pressure regulator control knob clockwise until the low pressure gauge indicates 15
psig (100 kPag). Open each regulator shut-off valve by turning it counterclockwise. Open the
gas bottle shut-off valve. Flow gas for 10 to 30 seconds, then close each valve. These actions
purge the regulator and gas inlet tubing.
f.) Ensure that the gas shut-off bottle valve is completely closed (turn clockwise).
5.
Repeat steps 1 through 4 for each gas supply bottle to be attached to the analyzer.
6.
Proceed to the next section to connect the copper delivery tubing to the analyzer.
Connecting the Gas Delivery Tubing to the Analyzer
The gas inlet ports are located on the right side panel of the analyzer. The ports are labeled
1
through
6
.
To change the gas attached to one of the ports:
1.
Make sure the port valve is closed (refer to
).
2.
Detach the gas line from the desired port.
3.
Attach the new gas line to the port.
4.
Make sure any unused gas inlet ports are plugged.
5.
Record the gas installed in the port in the analysis program as described in the following section.
If you are using hazardous gases, make sure the gas supply
equipment is adequately vented to prevent purging the regulator
and tubing into the lab atmosphere in the following step.
Summary of Contents for ASAP 2460
Page 4: ......
Page 12: ...Table of Contents ASAP 2460 Operator s Manual viii 246 42800 01 Nov 2013...
Page 30: ...Using the Software ASAP 2460 Operator s Manual 1 18 246 42800 01 Aug 2013...
Page 93: ...ASAP 2460 Operator s Manual Generating Graph Overlays 246 42800 01 Aug 2013 2 63...
Page 94: ...Generating Graph Overlays ASAP 2460 Operator s Manual 2 64 246 42800 01 Aug 2013...
Page 202: ...Service Test ASAP 2460 Operator s Manual 4 36 246 42800 01 Aug 2013...
Page 230: ...Report Examples 2460 Operator s Manual 5 28 246 42800 01 Aug 2013 Isotherm Linear Plot...
Page 231: ...2460 Operator s Manual Report Examples 246 42800 01 Aug 2013 5 29 BET Surface Area Report...
Page 232: ...Report Examples 2460 Operator s Manual 5 30 246 42800 01 Aug 2013 BET Surface Area Plot...
Page 233: ...2460 Operator s Manual Report Examples 246 42800 01 Aug 2013 5 31 t Plot Report...
Page 236: ...Report Examples 2460 Operator s Manual 5 34 246 42800 01 Aug 2013...
Page 242: ...Service Test Mode 2460 Operator s Manual 6 6 246 42800 01 Aug 2013...
Page 270: ...Calibrating the System ASAP 2460 Operator s Manual 7 28 246 42800 01 Aug 2013...
Page 276: ...Ordering Information ASAP 2460 Operator s Manual 8 6 246 42800 01 Aug 2013...
Page 278: ......
Page 280: ......
Page 374: ...Appendix C ASAP 2460 Operator s Manual C 50 246 42800 01 Aug 2013...
Page 398: ...Appendix F ASAP 2460 Operator s Manual F 18 246 42800 01 Aug 2013...
Page 412: ...Index ASAP 2460 Operator s Manual Index 8 246 42800 01 Aug 2013...
Page 413: ...ASAP 2460 Operator s Manual Appendix G Aug 2013 SVP 1 SVP Smart VacPrep Operator Manual...
Page 414: ...Appendix G ASAP 2460 Operator s Manual SVP 2 Aug 2013...
Page 422: ...Contact Us vi Smart VacPrep Operator Manual...
Page 432: ...2 About the Software 2 4 Smart VacPrep Operator Manual...
Page 466: ...8 Error Messages 8 4 Smart VacPrep Operator Manual...