Preventive Maintenance
ASAP 2460 Operator’s Manual
7-4
246-42800-01 - Aug 2013
Preventive Maintenance
The table below lists the preventive maintenance procedures you should complete to keep your ana-
lyzer operating at peak performance. Instructions for each procedure follow the table. Micromeritics
also recommends that you have preventive maintenance procedures and calibration performed by one
of our service representatives every 12 months.
Maintenance Required
Frequency
Checking and cleaning analysis port dewars,
Weekly
Replace port filters,
Every 30 days
Replace sample tube O-ring,
page
As required or every 3 months
Inspect and change vacuum pump fluid*,
page
As required or every 3 months
Replace alumina in oil vapor traps*,
page 7-13
As required or every 3 months
Clean the outside of the analyzer,
page 7-16
As required or every 6 months
Check analyzer outgassing rate,
page 7-17
Every 6 months
Test analyzer for leaks,
As required or every 12 months
Replace vacuum pump exhaust filter,
page 7-19
As required or every 12 months
Replace diaphragm in vacuum pump (if an oil-free
pump is used)**
Every 12 months
*Oil-sealed vacuum pumps only.
**For oil-free pumps only: After about 12 to 18 months of operation, the diaphragm in the pump will
wear out. When the diaphragm wears out, the pump becomes completely inoperable. To prevent any
instrument down time due to an inoperable pump, we recommend that you have the diaphragm
replaced by a Micromeritics Service Representative every 12 months.
Summary of Contents for ASAP 2460
Page 4: ......
Page 12: ...Table of Contents ASAP 2460 Operator s Manual viii 246 42800 01 Nov 2013...
Page 30: ...Using the Software ASAP 2460 Operator s Manual 1 18 246 42800 01 Aug 2013...
Page 93: ...ASAP 2460 Operator s Manual Generating Graph Overlays 246 42800 01 Aug 2013 2 63...
Page 94: ...Generating Graph Overlays ASAP 2460 Operator s Manual 2 64 246 42800 01 Aug 2013...
Page 202: ...Service Test ASAP 2460 Operator s Manual 4 36 246 42800 01 Aug 2013...
Page 230: ...Report Examples 2460 Operator s Manual 5 28 246 42800 01 Aug 2013 Isotherm Linear Plot...
Page 231: ...2460 Operator s Manual Report Examples 246 42800 01 Aug 2013 5 29 BET Surface Area Report...
Page 232: ...Report Examples 2460 Operator s Manual 5 30 246 42800 01 Aug 2013 BET Surface Area Plot...
Page 233: ...2460 Operator s Manual Report Examples 246 42800 01 Aug 2013 5 31 t Plot Report...
Page 236: ...Report Examples 2460 Operator s Manual 5 34 246 42800 01 Aug 2013...
Page 242: ...Service Test Mode 2460 Operator s Manual 6 6 246 42800 01 Aug 2013...
Page 270: ...Calibrating the System ASAP 2460 Operator s Manual 7 28 246 42800 01 Aug 2013...
Page 276: ...Ordering Information ASAP 2460 Operator s Manual 8 6 246 42800 01 Aug 2013...
Page 278: ......
Page 280: ......
Page 374: ...Appendix C ASAP 2460 Operator s Manual C 50 246 42800 01 Aug 2013...
Page 398: ...Appendix F ASAP 2460 Operator s Manual F 18 246 42800 01 Aug 2013...
Page 412: ...Index ASAP 2460 Operator s Manual Index 8 246 42800 01 Aug 2013...
Page 413: ...ASAP 2460 Operator s Manual Appendix G Aug 2013 SVP 1 SVP Smart VacPrep Operator Manual...
Page 414: ...Appendix G ASAP 2460 Operator s Manual SVP 2 Aug 2013...
Page 422: ...Contact Us vi Smart VacPrep Operator Manual...
Page 432: ...2 About the Software 2 4 Smart VacPrep Operator Manual...
Page 466: ...8 Error Messages 8 4 Smart VacPrep Operator Manual...