Isolated Flyback Converter Evaluation Board
Microsemi Proprietary and Confidential. PD70201EVB25F-D-5 User Guide Revision v1.0
8
3
Installation
Ensure that the board's power source is turned OFF before all peripheral devices are connected.
3.1
Initial Configuration
Note:
Prior to starting any operation, it is important to verify that the evaluation board is setup as
shown in the following figure.
Connect load to the board (using J1).
Connect a Cat5 cable from PSE or a DC power supply to evaluation board using input connector J3.
Figure 3
•
Test Setup