24
MPPT OPERATION
5.2
Checks Prior To Start-Up
•
Ensure the MPPT is mounted vertically.
•
Check input output cables are secured.
•
Check the polarity of the panel and battery and they are correct.
•
Check if the Panel Voltage meets the MPPT rating required.
5.3
MPPT Start-up Procedure
•
Always turn on battery breaker first.
•
Wait until MPPT Display states that the MPPT is sleeping.
•
Turn on Panel Breaker.
•
MPPT will track the PV Panels.
•
MPPT will start charging the batteries.
PLEASE BE AWARE:
WARRANTY WILL BE NULL AND VOID IF PANEL
SURGE PROTECTION IS NOT INSTALLED WITH
ALL LCD MPPT INSTALLATIONS