![Micno 3kW DC24V User Manual Download Page 16](http://html1.mh-extra.com/html/micno/3kw-dc24v/3kw-dc24v_user-manual_1784750016.webp)
14
Indicates unit connects to the mains.
Indicates unit connects to the PV panel.
Indicates load is supplied by utility power.
Indicates the solar charger circuit is working.
Indicates the DC/AC inverter circuit is working.
Mute Operation
Indicates unit alarm is disabled.
LCD Setting
After pressing and holding "ENTER" button for 2 seconds, the unit will enter setting mode. Press "UP" or "DOWN"
button to select setting programs. And then, press "ENTER" or "ESC" button to confirm the selection and exit.
Setting Programs:
Program
Description
Select-able option
01
Output voltage
NOTE: When the
output voltage is set
to 208V, the output
needs to be derated
to 90%.
02
Output frequency
03
Output source
priority : To
configure load
power source
priority
Utility will provide power to the loads
as first priority.
Solar and battery energy will provide
power to the loads only when utility
power is not available.
Solar energy provides power to the
loads as first priority.
If solar energy is not sufficient to
power all connected loads, Utility
energy will supply power to the loads
at the same time.
Solar energy provides power to the
loads as first priority.
If solar energy is not sufficient to
power all connected loads, battery
energy will supply power to the loads
at the same time.