
PROMET EExd Process Moisture Analyzer Sampling Systems
Installation, Operation & Maintenance Manual
and User
Guide
____________________________________________________________
20
____________________________________________________________
www.michell.com
To replace the particulate filter element, proceed as follows:
1.
Isolate the sampling system from the gas supply in accordance with the System
Shutdown Procedure.
2.
Unscrew and remove the filter bowl from the body of the filter (F1).
3.
Remove and clean/discard the filter element.
4.
Refit a new filter element
(Michell Part No. PTS-PFE).
5.
Replace the filter bowl back into the body of the filter until it reaches the
mechanical stop.
6.
Resume normal system operation as described in the System Start-Up
Procedure.