![MHS Boilers ADI LT Installation, Operation And Maintenance Manual Download Page 24](http://html1.mh-extra.com/html/mhs-boilers/adi-lt/adi-lt_installation-operation-and-maintenance-manual_1783512024.webp)
ADI LT boiler - Technical Manual
Page
L338
11/2011
24
11.6 REGULATION OF SEVERAL BOILERS
In an installation with several boilers it is important that the power generated by the boilers adapts at any moment
to the demand of the installation, always optimizing the generators’ efficiency.
11.6.1 Boilers simple sequence
The control unit must regulate the stop/start sequence of each boiler according to the demand of the installation (by
means of the flow temperature probe, which is common to all boilers, and at a constant flow temperature).
Then, each boiler will regulate its own power modulation according to the set-up temperature programmed for each
one.
The set-up temperature value of the control unit must be a bit higher than the value adjusted in each boiler.
We recommend realizing the boilers
’ sequence and regulation according to the instructions indicated in the
following paragraphs.
11.6.2 External control unit with signals 0…10 V to regulate the start-up and modulation of each boiler.
So that each boiler can receive and process an external signal type
0…10 V, it must be provided with (consult
prices):
- An additional module, or clip-in, model AGU 2.51
- A cable for connecting the additional module to the boiler control unit, mod. AGU2.104A109
Clipin
AGU2.510A109
LMU
This module enables an analog entry, that can be of two types:
- Probe (NTC, 10 K
Ώ)
-
Voltage signal: 0…10 V
The signal 0…10 V will transmit to the boiler or a set-up temperature
value or a percentage of power output, so that it can operate (as it
will be set up in our factory).
The signal 0…10 V must be connected to the te (1) of the
strip X51-
01 of the “clipin”; to terminal 2 is connected n earth.
Just one module type AGU2.510 can be connected to the boiler
control unit LMU, even though a total of 2 modules of different type
can be connected.
The connection between the module clip-in AGU2.510 and the boiler
control unit LMU must be realized by connecting the cable to the
terminal X50 of the LMU (see electric diagrams).
Do not connect the cable to terminals X52.
Front and lower
view of the
“clipin”
Connecting cable