
6
– English
English
INSTALLATION: ASSEMBLY AND CONNECTION OF COMPONENTS
––– STEP 5 –––
WARNINGS
• Incorrect installation may cause serious physical injury to those
working on or using the system.
• Before starting automation assembly, make the preliminary checks
as described in STEP 3
.
5.1
- INSTALLING THE GEARMOTOR WG10SK
To secure the gearmotor, proceed as follows:
01.
Select the fixing position, observing the specifications in paragraph
3.1 “Preliminary checks”;
02.
Ensure that the fixing surface is perfectly smooth, level and sufficient-
ly compact. WG10SK is not supplied with fixing devices, which must
be chosen also on the basis of the fixing surface material.
03.
Lay the duct for routing the electric cable (
fig. 8
);
04.
To construct the rear supports, assemble the two brackets and rear
plate as shown in
fig. 9
;
05.
the brackets and rear plate can be assembled in different ways: to
IMPORTANT!
- The following assembly phases show installation of a gearmotor
model WG10SK.
- To ensure correct system operation, mechanical stops must be
mounted on the floor or wall at the maximum leaf opening and closing
points.
Note
- These stops are not supplied in the pack and are not
part of the Mhouse product range.
obtain the various values of “C” see
fig. 10
;
06.
To construct the front support, assemble the bracket and front plate
as shown in
fig. 11
;
07.
Remove the rear cover of the gearmotors pulling it out in the direction
of the arrows (
fig. 12
);
08.
Move the leafs to the closed position;
09.
With reference to the previously calculated position “B” (
fig. 4
and
5
),
place the rear support on the fixing surface, in the envisaged position;
Caution!
- check the positions in fig. 15.
10.
Trace the drilling points of the rear support using the support as a ref-
erence Using a drill make four holes on the surface for insertion of 4
plugs of at least 8 mm (not supplied). Fix the plate with suitable
screws and washers (
fig. 13
);
11.
Ensure that the plate is perfectly level (the slots on the bracket enable
small corrections to alignment, as shown in
fig. 14
);
12.
Place the front support as shown in
fig. 15
;
13.
Provisionally secure the front support to the leaf with a clamp
(fig.
16)
;
14.
Lift the gearmotor and insert the fork in the hole of the front support;
15.
Keeping the gearmotor raised, pull to open the leaf and align the hole
on the rear plate with the hole on the gearmotor. Fix the gearmotor to
the rear support
[A]
using screw
[B]
, nut
[C]
and washer
[D]
(
fig. 17
);
16.
Tighten the nut fully down then loosen by approx. half a turn to
enable rotation of the gearmotor on its support;
17.
Secure the gearmotor to the front support, tightening the screw
[E]
and washer
[F]
, then tighten the screw fully down (
fig. 18
);
18.
Unlock the gearmotor again using the release keys (see paragraph
11.3 - User’s Guide
);
6
a
e
f
h
b
c
d
g
c
g
f
e
7
A
D
B
C
E
D
F
D
G
G
Summary of Contents for WG10SK
Page 2: ......
Page 7: ...English 5 English 2 3 4 5 GRAPH 2 1 B F D C A G E maximum leaf length m Maximum leaf weight kg...
Page 10: ...8 English English 8 9 11 12 13 14 15 10...
Page 11: ...English 9 English 16 17 18 19 20 B A C D E F G H 21 22 23...
Page 13: ...English 11 English 30 A B 6 mm x4 A B A B A B B B B 1 2 3 4 1 2 3 4 5 29 6 B C A D E F...
Page 14: ...12 English English 30 A B A B A B A B A B A B 5 6 7 8 9 11 12 10 A B A B 6 mm x4 A A A A 4...
Page 16: ...14 English English 31 A B 32 A C B 33 35 A B A B 34 T1 T2 T3 T4...
Page 34: ......
Page 35: ......