![MHGOALS FT-342 Installation Manual Download Page 7](http://html1.mh-extra.com/html/mhgoals/ft-342/ft-342_installation-manual_1783425007.webp)
DETAIL, W
SCALE: 1 : 2.5
32mm Back Bar
Spring Clip
W
1
1
2
2
3
3
4
4
5
5
6
6
7
7
8
8
9
9
10
10
11
11
12
12
A
A
B
B
C
C
D
D
E
E
F
F
G
G
H
H
SHEET
7 OF
8
REVISION
1
Instructions for ALL
Folding Goals
MH Goals Ltd,
Ellough Industrial Estate,
Beccles, Suffolk,
NR34 7TD
Parts Required
PLEASE NOTE THAT ON A 24 X 8 THE BACK BAR IS
SPLIT INTO 2 SECTIONS, THIS WILL BE SECURED
TOGETHER BY SLIDING THE SWAGED (REDUCED)
END OF ONE SECTION INTO THE OTHER HALF,
LINING UP THE HOLES AND FASTENING USING THE
SUPPLIED M10 X 45 HEX HEAD BOLT & M10 NYLOC
Step 5 -
THIS STEP MAY REQUIRE MORE
THAN ONE PERSON DEPENDING
ON THE GOAL SIZE, THIS IS TO
PREVENT ANY HARM OR INJURY
OCCURRING!
Lift the goal assembly into a vertical position and
open the net supports up so that they are 90 to the
crossbar.
To attach the back bar to the goal frame place the
ends of the back bar into the back bar brackets,
lining up the holes and securing in place with the
supplied spring clip. See Detail W