1 VIEW
1
1
2
2
3
3
4
4
5
5
6
6
7
7
8
8
9
9
10
10
11
11
12
12
A
A
B
B
C
C
D
D
E
E
F
F
G
G
H
H
SHEET
1 OF
8
REVISION
1
Instructions for ALL
Folding Goals
MH Goals Ltd,
Ellough Industrial Estate,
Beccles, Suffolk,
NR34 7TD
Installation of Goals
Always use the instructions and recommendations provided by the manufacturer when installing
equipment
The appropriate personal protective equipment (PPE) must be worn at all times. I.E. Hard hat, steel
toe cap boots, gloves, etc.
When tall and/or heavy equipment is being assembled, it is recommended that scaffolding and/or
heavy lifting equipment is used.
A risk assessment should be carried out if necessary.
Installation should only be undertaken by, or under the direct supervision of, trained persons with
enough experience and with the adequate assistance for the size of the goal being assembled.
For spares or assistance please get in contact with MH GOALS Via -
T - 01502 711 298
E - [email protected]
W - www.mhgoals.com