Site requirements
z
Ensure that the laboratory floor is level and with a gradient of less than
1/200.
z
Ensure that the laboratory is free of dust, corrosive and flammable gas, and
heat and wind sources.
z
Ensure that the laboratory is away from direct sunlight and well ventilated.
We recommend that you refer to the standard of a biosafety level (BSL) 2
laboratory.
z
Ensure that enough space is provided around the device for ventilation,
cable connection, and power switch operation.
The following figure indicates distances that are required for optimal
operation and access.
≥
500 mm
(20 inches)
≥
500 mm
(20 inches)
≥
500 mm
(20 inches)
≥
500 mm
(20 inches)
≥
500 mm
(20 inches)
Device
Device
Operation area
Figure 4 Space requirements
Network requirements
Operating environments of the computer
Minimum configuration
Processor: Intel Core i3
Summary of Contents for MGISTP-3000
Page 3: ...Revision history Date Version Initial release March 30 2021 1 0 ...
Page 7: ... T h i s p a g e i s i n t e n t i o n a l l y l e f t b l a n k ...
Page 23: ... T h i s p a g e i s i n t e n t i o n a l l y l e f t b l a n k ...
Page 24: ...17 Getting started This chapter describes laboratory preparations and experiment preparations ...
Page 35: ... T h i s p a g e i s i n t e n t i o n a l l y l e f t b l a n k ...
Page 41: ... T h i s p a g e i s i n t e n t i o n a l l y l e f t b l a n k ...
Page 45: ... T h i s p a g e i s i n t e n t i o n a l l y l e f t b l a n k ...
Page 47: ... T h i s p a g e i s i n t e n t i o n a l l y l e f t b l a n k ...
Page 49: ... T h i s p a g e i s i n t e n t i o n a l l y l e f t b l a n k ...
Page 51: ...Index 44 N Network requirements 18 P Power switch 13 R re position 3 ...