![MG Energy Systems MGRS12S4P176 Manual Download Page 34](http://html1.mh-extra.com/html/mg-energy-systems/mgrs12s4p176/mgrs12s4p176_manual_1782743034.webp)
MG Energy Systems B.V. | Foeke Sjoerdswei 3 | 8914 BH Leeuwarden | The Netherlands
+31 (0)58 750 89 47 | [email protected] | www.mgenergysystems.eu
Innovation
in energy storage
8.2
Mounting procedure
This procedure describes how to mount the battery module with respect to the integration
requirements stated in chapter 7.
1.
Lift the battery module to its location using the mounting points specified in figure 16.
2.
Use M8 bolts with washers and spring washers or a lock nut for mounting.
3.
Tighthen the M8 bolts at the four mounting points with 20 Nm.
Figure 16 – Mounting points
8.3
Equipotential bonding connection procedure
The equipotential bonding connection location of the battery module is the same as the mounting
bracket. One of the four mounting points can be used for this. Equipotential bonding connection
scheme and the required wire cross-section depend on local standards and regulation. The typical
used wire cross-section is 10 mm
2
.
NOTICE:
Make sure a toothed contact washer is used to make a good connection through
the powder coating.
Mounting points