5.
Installation
5.3
Installation
of
the
emergency
hand
chain
(only
for
operators
with
emergency
hand
chain)
Information:
To
ensure
that
they
work
correctly,
the
chain
links
must
not
be
twisted.
6.
Initial
Operation
6.1
Preparation
Warning!
To
avoid
damage
to
the
operator,
the
following
points
must
be
observed:
-
The
types
of
cable
and
their
diameters
must
be
selected
according
to
current
regulations.
-
The
nominal
currents
and
the
type
of
connection
must
correspond
to
those
on
the
motor
type
plate.
-
The
drive
details
must
agree
with
the
connected
loads.
Information:
When
operated
with
electronic
control
units,
the
corresponding
start-up
instructions
and
circuit
diagrams
must
be
complied
with.
☞
Join
the
ends
of
the
emergency
hand
chain
together
with
the
chain
connecting
link.
Warning!
To
avoid
damage
to
the
operator
and
the
door,
the
emergency
hand
chain
must
be
secured
while
the
door
is
operated
electrically.
6
–
Roll-Up
Door
Operator
/
MDF
/
Rev.
0.0
Summary of Contents for MDF 05-10-15
Page 1: ...Operating Instructions for Roll Up Door Operators MDF GB Roll Up Door Operator MDF Rev 0 0 1...
Page 21: ...GB MDF 20 22 12 KE Chain MDF 20 15 17 KE Chain Roll Up Door Operator MDF Rev 0 0 21...
Page 23: ...GB MDF 30 42 12 KU Crank MDF 30 42 12 KE Chain Roll Up Door Operator MDF Rev 0 0 23...
Page 25: ...GB MDF 30 27 12 KU 100 Crank MDF 30 30 12 KU Crank Roll Up Door Operator MDF Rev 0 0 25...
Page 27: ...GB MDF 30 50 12 KE Chain MDF 50 65 10 KU Crank Roll Up Door Operator MDF Rev 0 0 27...
Page 29: ...GB MDF 50 75 10 KE Chain MDF 6 100 9 KU Crank Roll Up Door Operator MDF Rev 0 0 29...
Page 32: ......