
MFJ-1795 Vertical Antenna
Instructions
9
Figure 6
U-bolts
Bushing
SO-239
Anetnna Base
[ ] 3.
The plastic bushing supplied in the parts should be placed in the hole under the SO-239
connector.
[ ] 4.
Now the 15” piece of insulated wire should be passed through the plastic bushing to the
antenna feed-point.
SO-239
Bus Wire
Figure 7