Sawyer Manufacturing Company
7799 S. Regency Dr., Tulsa, OK 74131 USA
F
918.834.0318
P
918.834.2550
sawyermfg.com
V1.2
Installation
1.
Open band by pulling up on latch handle
(C, Fig. 1)
assembly free from latch anchor.
(B, Fig. 1)
2.
Release band from latch base assembly.
(D, Fig. 2)
3.
Place band on pipe to be beveled.
(Fig. 3)
4.
Close band by pushing down latch handle.
(C, Fig. 4)
Note: Turn handle screws: clockwise for tightening tension,
counterclockwise to loosen tension.
Note: Band gap should be 3/16”.
Note: All bullets should be touching pipe.
WARNING:
Refer to manufacturers settings
for safety settings.
!
!
WARNING
CAUTION
:
Do not use cheater bar to clamp
down on handle assembly (C). Refer to band
type manual transmission for installation/
operation of transmission.
!
!
CAUTION
C
C
D
B
Fig. 1
Fig. 2
Fig. 3
Fig. 4