
PB-74/7500
- 26 -
LUBRICATION
WARNING: DISCONNECT PTO DRIVE SHAFT AND HYDRAULIC HOSES (RELIEVE HYDRAULIC
PRESSURE) BEFORE CLEANING, ADJUSTING, LUBRICATING OR SERVICING THIS MACHINE. FAILURE
TO HEED MAY RESULT IN SERIOUS PERSONAL INJURY OR DEATH.
DAILY LUBRICATION (every 8-12 loads)
Grease (2) rear spinner lower bearings. These
bearings are grease line fitted to the LR frame
channel of the spreader.
Keep the reservoir tank full of new 30 weight
oil for chain lubrication. The automatic chain oiler will
lubricate the chains automatically every time the rear
gate, hydraulic cylinder is activated. The reservoir is
accessible by opening the front steel shield cover.
Grease PTO Drive line (9) places with Lithium
grease every 8 hours. (See PTO LUBRICATION
section for further detail.)
Grease (4) bearings supporting the two large
jack shaft reduction sprocket weldments on the front
drive. The zerks are accessible by opening the front
steel shielding cover and through the front bearing
plate.
Grease (2) auger shaft bushings. These
bearings are grease line fitted to the RF shield of the
spreader. Grease Daily, Minimum of 10 pumps. Over
greasing is not possible.
WEEKLY LUBRICATION (every 25-30 loads)
Grease (2) PTO input shaft bearings. These
bearings are grease line fitted to the RF shield of the
spreader.
Grease bearings on the RH side line shaft. The
front bearing is zerk accessible through the RF steel
shielding. The remaining rear bearings are located
along the RH side of the spreader tank, zerks
accessible through the steel shielding.
Grease (4) tandem wing pivots. Effectively
grease by jacking up the spreader to relieve pressure
points on the pivot shaft. Over greasing is not
possible.
(All 7400 Models and 7500 Models prior to
2011) grease (2) flow control rear gate and lifting arm
pivot points. Grease gate pivot at center of flow control
rear gate. Grease lifting arm pivot support at LR of
spreader. Over greasing is not possible. Apply grease
to slot in gate lift arm.
Grease (2) flow control rear gate slide guides.
With the flow control gate in the closed position,
grease the zerk located on each side of the gate
slides.
Grease 4-6 pumps on each side and run gate up and
down several times. Repeat the greasing until gate
slides are heavily lubricated. In freezing weather
dump used motor oil down each slide guide once a
week or more often if needed. Over greasing is not
possible.
Grease (1) integral overrunning clutch at rear
of the PTO drive line. The zerk is on the yoke of the
clutch. Use Shell Super Duty or an equivalent lithium
grease.
Check regularly for any observable lube
leakage of the (3) gearboxes at the rear of the
spreader. See L12 under
page 27.
L1
L2
L3
L4
L5
L6
L7
L8
L9
L10
L11
L12
Summary of Contents for V-FORCE 7400 Series
Page 30: ...PB 74 7500 30 REPAIR PARTS FRONT SHIELD SIDE SHAFT DRIVE...
Page 32: ...PB 74 7500 32 AUGER DRIVE PRIMARY REDUCTION...
Page 35: ...PB 74 7500 35 This Page Intentionally Blank...
Page 40: ...PB 74 7500 40 BOX AUGERS SIDE SHAFT...
Page 42: ...PB 74 7500 42 7400 7500 UNLOADING GATE MATERIAL GUIDES 7500 PRIOR TO 2011 MODEL YEAR...
Page 44: ...PB 74 7500 44 7400 7500 UNLOADING GATE MATERIAL GUIDES CONT D 7500 PRIOR TO 2011 MODEL YEAR...
Page 46: ...PB 74 7500 46 7500 UNLOADING GATE MATERIAL GUIDES 2011 MODEL YEAR LATER...
Page 48: ...PB 74 7500 48 SPINNERS GEARBOX SHAFT DRIVE...
Page 53: ...PB 74 7500 53 This Page Intentionally Blank...
Page 54: ...PB 74 7500 54 HUBS AXLE TANDEM AXLE ASSEMBLY...
Page 56: ...PB 74 7500 56 THIRD AUGER...
Page 58: ...PB 74 7500 58 OIL KIT...
Page 60: ...PB 74 7500 60 V FORCE LIGHTING...
Page 71: ...PB 74 7500 71 This Page Intentionally Blank...
Page 75: ...PB 74 7500 75 This Page Intentionally Blank...
Page 84: ...PB 74 7500 84 This Page Intentionally Blank...
Page 85: ...NOTES...
Page 86: ...NOTES...