![Meyer RL30-30 Owner'S/Operator'S Manual Download Page 41](http://html1.mh-extra.com/html/meyer/rl30-30/rl30-30_owners-operators-manual_1781622041.webp)
1-800-325-9103
PB-RL30-21
- 41 -
www.meyermfg.com
8.2.3 Wheels and Tires
Reloader Tire Wheel Installation
•
Clean adjoining surfaces.
•
Start nuts to bring wheel flush to hub mounting surface.
•
Avoid wheel binding on hub.
•
Install remaining wheel nuts. Torque to 50 ft-lbs. Then re-torque to required full torque.
•
Re-torque wheel nuts after 50-100 miles.
Tire Inflation
BOLT/STUD SIZE
SOCKET SIZE
PRESS FORMED
WHEEL CENTER
BOLT TYPE
HEAVY DUTY
WHEEL CENTER
5/8
15/16 / 1-1/16
100 ft lbs
Bevel or Flange Nut
160
ft-lb
3/4
1-1/8 / 1-1/2
N/A
Flange Nut
378
ft-lb
TIRE SIZE
PSI
386/65/22.5
100
THESE INSTRUCTIONS ARE NOT COMPLETE. READ AND FOLLOW
ALL PROCEDURES IN USER’S GUIDE TO WHEELS AND RIMS BY
“THE MAINTENANCE COUNCIL” #T0410.