MEWOI MEWOI4000 User Manual Download Page 17

 

-14- 

3 seconds) to enter data reading, press 

or 

  button to select reading 

data  group  number  by  step  value  1,  press 

or 

button  constantly  to 

select reading data group number by step value 10, press 

  button to read 

the  maximum,  minimum  and  average  value  of  this  group  of  data,  and  then 
press   

  button to exit from reading.   

On reading if there is no storage data, LCD will display “

-  -  -  -

”, see the 

above right figure.   

Under data reading status, press 

button to enter data deletion, press 

or 

 

to  select  “

no

”  or  “

YES

”,  selecting 

no

”  and  then  pressing  “

MEM

” 

button  for  not  deleting  return  data  reading  status,  selecting  “

YES

”  and  then 

pressing “

MEM

” button for deleting stored data and it will show as above right 

figure after deletion.   

 

12

Data Upload 

Make good connection of company with RS232 communication wire of 

the  Tester,  switch  on  the  Tester  and  run  monitoring  software,  and  if  the 
software  displays  that  interface  is  open  and  the  connection  is  successful, 
then it can read the stored historical data, upload to company and preserve.   

Monitoring  software

  has  the  function  of  online  real-time  monitoring 

and  historical  inquiry,  dynamic  display,  with  the  maximum,  minimum,  and 
average value indication, with alarm value settings and alarm indicator, and 
the  function  of  historical  data  access,  reading,  preserve,  print  and  other 
functions. 

 

VIII. Battery Replacement 

 

Please don’t replace battery in flammable spot

 

Please don’t replace battery during measurement 

 

Pay attention to battery polarity and specification, and don’t 
mix use of new and used battery to avoid damage on Tester 

 

When  the  enclosure  of  Tester  is  wet,  please  do  not  open 
battery cover

 

Please put the used batteries in appointed collection place.

 

 
1.

 Switch off; making sure that the Tester is under switch-off state. 

2.

 Loosen the four screws on battery cover at the bottom of the Tester, and 

open battery cover. 

3.

Replace new battery, pay attention to battery polarity and specification, 

close battery cover, and fasten screw.   

4.

 Switch on verification, otherwise re-operate.   

 

Summary of Contents for MEWOI4000

Page 1: ...Digital Earth Resistance Tester...

Page 2: ......

Page 3: ...Operation Methods 8 1 Switch On Off 8 2 Battery Voltage Check 8 3 Insert and Connection of Rods 8 4 Grounding Voltage Measurement 9 5 Wire Resistance Verification 10 6 Precision Measurement 10 7 Simpl...

Page 4: ...n to words and symbols stick on the Tester It shall make sure that tester and accessories are in good condition before use it can be used only when there is no damaged naked or broken part in testing...

Page 5: ...lease set FUNCTION rotary switch to OFF after usage When the meter displays battery low voltage symbol and you need to replace the battery in time If the Tester is not going to be used for a long peri...

Page 6: ...ion more accurate on measuring on site low value earth ground resistance which can avoid error caused by resistance change due to prolonged usage of testing wire avoid error caused by testing wire tha...

Page 7: ...cise 3 pole measurement simple 2 pole measurement Measuring Method Earth ground resistance rated current change pole method measurement current 3mA Max 820Hz Voltage to ground average value rectificat...

Page 8: ...display FULL icon to indicate storage is full Data Hold Data hold function HOLD icon display Data Read Data read function READ icon display Overflow Display Exceeding measuring range overflow function...

Page 9: ...sulation Resistance Over 10M between circuit and enclosure it is 500V Withstanding Voltage AC 3700V rms Between circuit and enclosure Electromagnetic Features Wireless frequency electromagnetic field...

Page 10: ...ent with fall of potential method AC constant current I 3mA Max 820Hz is applied between the measurement object E earth electrode and C current electrode and finding out the potential difference V bet...

Page 11: ...tch on and off When rotary switch button displays OFF for shut off The Tester has no auto shut off function so please shut it off after usage in case of battery consumption saving 2 Battery Voltage Ch...

Page 12: ...the case of short circuit of P C interface Otherwise measuring voltage in the grounding circuit of cutout switch may cause cutout switch start On measuring grounding voltage please do not impose over...

Page 13: ...value and stores it For this time switch on it will automatically deduct the verified wire resistance value from earth ground resistance measurement It will not preserve the verified wire resistance...

Page 14: ...asured values by pressing CLR button 7 Simple Measurement When select commercial use power supply system earth as auxiliary earth electrode it must use detector to confirm that is it the earth ground...

Page 15: ...resistance value of common grounding object like commercial use power system Then the earth ground resistance value of measured grounding object is RX RE re Adopting simple method for measurement of e...

Page 16: ...ess button for a long time about 3 seconds to enter alarm critical value settings press or to change current digital press button to move cursor and then press button to store and exit When measuremen...

Page 17: ...d the connection is successful then it can read the stored historical data upload to company and preserve Monitoring software has the function of online real time monitoring and historical inquiry dyn...

Page 18: ...1 PC Auxiliary Grounding Rod 2 PCS Monitoring Software Disk 1 Copy RS232 Communication Cable 1 PC Testing Wire 3 PCS Simple testing wire 2 PCS Zinc manganese dry battery 6 PCS R14S 1 5V Manual Warran...

Page 19: ......

Page 20: ...Your Testing Specialist...

Reviews: