METRUM ComMi Installation Manual Download Page 15

ComMi 

 

© 201

Metrum Equipamentos de Medição e Testes LTDA. 

All rights reserved. 

15 

 

5.7

 

LED Indicators 

 

Figure 11  - LED Panel 

 

 

Table 5 - LEDs 

FUNCTION 

DESCRIPTION 

STATUS  

POWER 

Device powered on 

Constant 

RUN 

Application running 

Blinking 

Tx 

Transmiting data 

Blinking 

Rx 

Receiving data 

Blinking 

SYNC 

Synced date and time 

Constant 

 

 

Summary of Contents for ComMi

Page 1: ...1 0002 1117 2019 ComMi Energy Management and Control Unit Installation Manual ...

Page 2: ...Installation Manual 2019 Metrum Equipamentos de Medição e Testes LTDA All rights reserved 2 ...

Page 3: ... Precautions 4 2 Notes 5 3 Introduction 6 3 1 Content 6 3 2 Tools 6 4 Overview 7 4 1 Main Components 7 5 Installation 8 5 1 Dimensions 8 5 2 DIN Rail 9 5 3 Communication 10 RS 485 10 Ethernet 11 5 4 Power Supply 12 5 5 Turning the device on 13 5 6 RESET Button Functions 14 5 7 LED Indicators 15 ...

Page 4: ...lations established by the installation site Before performing visual inspection testing or maintenance on this equipment make sure that it is de energized Use personal protective equipment PPE appropriate to the practice to be performed Unplug all devices that will be connected to ComMi before making connections Proper operation of this equipment depends on proper handling installation and operat...

Page 5: ... A Metrum Equipamentos de Medição Testes Limitada as manufacturer of this equipment reserves the right to make any changes in this installation manual without previous notice The images contained in this installation manual are merely illustrative and of no more than instructional value ...

Page 6: ...gration of information from energy meters and protocols The equipment receives records the data of the energy vectors and displays them in an embedded interface with access via browser With integration capacity of up to 32 meters this unit is ideal for energy billing metering systems 3 1 Content 1 ComMi 2 Power Supply Connector 3 RS 485 Connector 4 Extraction tool 3 2 Tools 1 Screwdriver 2 Clamp F...

Page 7: ...uipamentos de Medição e Testes LTDA All rights reserved 7 4 Overview 4 1 Main Components Figure 2 Perspective View 1 RS 485 Input 2 10 100BASE TX 802 3u Input 3 24VCC Power Supply 4 Indicator LED s 5 RESET Button 6 QR Code ...

Page 8: ...Installation Manual 2019 Metrum Equipamentos de Medição e Testes LTDA All rights reserved 8 5 Installation 5 1 Dimensions Figure 3 Dimensions ...

Page 9: ...ComMi 2019 Metrum Equipamentos de Medição e Testes LTDA All rights reserved 9 5 2 DIN Rail Figure 4 DIN Rail 1 DIN Rail ...

Page 10: ...ation RS 485 Figure 5 RS 485 Table 1 RS 485 Connector Type header Wire shielded twisted pair 28AWG to 16AWG Maximum Length 1 200 meters Maximum devices connected 32 1 Unleash approximately 6mm of wire 2 According to the need of the user make the connection of the wires in the connector screwing them to it ...

Page 11: ... 11 3 Connect the wires according to need as shown in Figure 6 D signal at terminal 1 D signal at terminal 2 ground signal terminal 3 and shielding signal at terminal 4 Figure 6 Terminals Ethernet Figura 7 Conexão Ethernet Table 2 Ethernet Wire Twisted pair cable CAT5 or CAT6 ...

Page 12: ...pe modular RJ45 Maximum Length 100 meters Class IEE 802 3 10 100BASE T 5 4 Power Supply Figure 8 Power Supply Table 3 Power Supply Connector Type push in spring connection Wire 26AWG to 20AWG Nominal Voltage 18 to 32Vcc Cable stripping 6mm 1 Make sure that the wires used in the connection are de energized ...

Page 13: ...nector above the terminal to which the wire is to be attached to compress the spring of the internal mechanism of the connector as shown in Figure 10 a 5 While the precision screwdriver pressures the spring compression insert the bare end of the wire into the desired terminal as shown in Figure 10 b 6 Remove the precision screwdriver keeping the wire attached as shown in Figure 10 c 7 Check if the...

Page 14: ...edure for inserting the wire into the connector Fonte HARTINGGroup HARTING har flexicon 2 54 mm Youtube setembro 2014 Disponível em https www youtube com watch v FezFXHCmwqQ Acesso em agosto 2017 5 6 RESET Button Functions 1 Resets the device if pressed quickly 2 Restores factory settings if pressed for 5 seconds ...

Page 15: ...ll rights reserved 15 5 7 LED Indicators Figure 11 LED Panel Table 5 LEDs FUNCTION DESCRIPTION STATUS POWER Device powered on Constant RUN Application running Blinking Tx Transmiting data Blinking Rx Receiving data Blinking SYNC Synced date and time Constant ...

Page 16: ...Installation Manual 2019 Metrum Equipamentos de Medição e Testes LTDA All rights reserved 16 Notes ...

Page 17: ...ComMi 2019 Metrum Equipamentos de Medição e Testes LTDA All rights reserved 17 Notes ...

Page 18: ...Installation Manual 2019 Metrum Equipamentos de Medição e Testes LTDA All rights reserved 18 Notes ...

Page 19: ...ComMi 2019 Metrum Equipamentos de Medição e Testes LTDA All rights reserved 19 Notes ...

Page 20: ... rights reserved 20 ComMi Energy Management and Control Unit Installation Manual Metrum Equipamentos de Medição e Testes LTDA Rua Leiria 174 Bairro São Francisco Belo Horizonte MG CEP 31255 100 Tel 55 31 3492 6944 www metrumsistemas com br Suporte técnico suporte memt com br ...

Reviews: