
■■■■■■■■■■■■■■■■■■■■■■
3 Installation
2.850.9110 IC Amperometric Detector
■■■■■■■■
11
NOTICE
The detector connection cable cannot be extended!
1
Connect the detector connection cable to the detector connection
socket
Detector 1
or
Detector 2
.
3.3
Putting the amperometric detector into operation
The IC Amperometric Detector is put into operation together with the IC
instrument in which it has been inserted to.
The following measures must be carried out on the IC Amperometric
Detector during the initial start-up of the IC system (see the chapter
Initial
start-up
in the manual for the IC instrument), even before the separation
column is used:
■
Testing the instrument electronics with the dummy cell
■
Testing the leak sensor
■
Testing the preheating capillary
■
Testing the detector output capillary
■
Testing the measuring cell
■
Deaerating the measuring cell
3.3.1
Instrument test with dummy cell
When you are putting the IC Amperometric Detector into operation for
the first time, or when problems occur which may be caused by signal
recording or signal transfer, we recommend testing the electronics and the
connection to the PC using the dummy cell (6.2813.040).
Proceed as follows:
Testing with the dummy cell
Prerequisites:
■
In order to achieve accurate results, we recommend that the front
cover be closed during the instrument test with the dummy cell. Since
the space under the front cover is rather limited, we further recom-
mend removing the measuring cell from the cell holder for the instru-
ment test with the dummy cell.
For the instrument test you require:
■
The dummy cell (6.2813.040)
Summary of Contents for 2.850.9110
Page 1: ...IC Professional Detector IC Amperometric Detector Manual 8 850 8062EN 2020 09 25 ...
Page 2: ......
Page 8: ......