
3.8 Capillary and cable feed-throughs
■■■■■■■■■■■■■■■■■■■■■■
30
■■■■■■■■
850 Professional IC–Anion – MSM-HC – MCS – LP Gradient
7
Drainage tubing
Section of the 6.1816.020 silicon tubing.
Guides escaped fluid into a waste container.
8
Drainage tubing connection
For draining escaped fluid from the base tray
through the connected drainage tubing.
9
Drainage tubing connection
For supplying escaped fluid through the con-
nected drainage tubing to the leak sensor.
Proceed as follows to install the drainage tubing:
Installing drainage tubing
1
Plug drainage tubing
into the drainage tubing connection
of the covering plate and shorten to required length.
2
Plug drainage tubing
into the drainage tubing connection
of the detector chamber and shorten to required length.
3
from the covering plate and drainage
from the detector chamber to the Y connector
4
to the Y connector
required length and plug the other end of the drainage tubing into
the drainage tubing connection
5
Plug drainage tubing
into the drainage tubing connection
of the base tray and guide the other end into a waste container.
3.8
Capillary and cable feed-throughs
Several openings have been integrated for feeding through capillaries and
cables. They are located on the doors
, on the
rear panel
or below the covering plate or above
.