Metro DataVac PrepMate Installation Instructions Download Page 1

INSTALLATION INSTRUCTIONS 

PrepMate    Sitting Fully Accessorised Cart

COMPONENTS

5" Total Lock 

Caster

Split Sleeve

(x3)

 Bags

(x12)

 

Sets Total

 Post

(x4)

PrepMate Rail

(x2)

All Models: 

3 Sided Tube frame

20

18

16

4

5

24

22

20

18

16

14

12

10

8

6

4

W

®

3

(x4)

(x2)

Remove 

Levelling Screw

(x4)

First 

Groove

Sleeve 

(x4)

1

(x4)

Bottom Frame

(x1)

Top Frame

(x1)

Split Sleeve

(x4)

    Place on Groove#19

Lock Caster

(x4)

Screw Caster 

Into Post

(x4)

PrepMate Rail

(x2)

Split Sleeve

(x4)

 For 32" Working 

Height, Place Split 

Sleeve at Groove #21 

 For 33" Working 

Height, Place Split 

Sleeve at Groove #22 

 For 34" Working 

Height, Place Split 

Sleeve at Groove #23

 For 35" Working   

Height, Place Split 

Sleeve at Groove #24 

 For 36" Working 

Height, Place Split 

Sleeve at Groove #25 

22

20

24

22

20

24

24

22

20

24

20

22

20

24

22

PrepMate Fully Assembled

2

STAINLESS STEEL  WORK

SURFACE

Rotate Thumb 

Nut Clockwise

UTENSIL BAR

www.metro.com

INSTR-CNB-TMKIT

Reviews: